Manufacturing and industrial estates
Plant networks, historians, MES and the engineering workstations that bridge OT and IT. Most estates have a documented boundary and no technical enforcement of it.
Surabaya runs on production: factories, the Tanjung Perak port corridor, distribution centres feeding eastern Indonesia, hospitals and universities. In these environments a security finding is not abstract — an unplanned stop costs more than most security budgets, and patient or student data is personal data with a legal clock attached.
We test manufacturing and logistics estates without stopping the line, and we test the applications that carry patient, student and customer records. The output is prioritised by what a plant manager, a hospital CIO and an auditor will each act on, rather than one undifferentiated list of findings.
Plant networks, historians, MES and the engineering workstations that bridge OT and IT. Most estates have a documented boundary and no technical enforcement of it.
Terminal operating interfaces, customs and partner integrations, fleet telemetry, temperature and condition monitoring. Availability matters more than confidentiality here, and the test plan reflects that.
Patient record systems, imaging archives, pharmacy and billing, plus medical devices on the same flat network as office desktops. This is where UU PDP obligations meet clinical uptime.
Student and academic systems, campus wireless, franchise and point-of-sale estates. Large user populations with weak identity hygiene are the recurring pattern.
Patient, student and customer records with a 3×24-hour notification duty. Healthcare and education are squarely in scope, and both tend to have the longest log-retention gaps.
Documented processing, impact assessment and evidence of controls — the regulation that converts good intentions into auditable artefacts.
Electronic system operation duties, including security and data-handling obligations for registered operators.
Global buyers audit their Indonesian suppliers. A vendor security questionnaire with no evidence behind it can cost the contract, long before any regulator gets involved.
Full instrument list and deadlines: Indonesia cyber regulation tracker.
We start with the network boundary between OT and IT, because that is where scope disputes and real risk both live.
Configuration review, passive traffic capture and controlled checks before any active testing. Active steps only inside agreed maintenance windows.
Findings written in English and Indonesian, with the plant-floor implication stated next to the technical detail.
The engineers who tested are the engineers who retest, so closure means the condition was verified, not that a ticket was closed.
Yes. Most of the estate can be assessed with read-only and passive methods. Active testing that could affect a process is confined to maintenance windows you choose.
We assess the network path and configuration around medical devices. Vendor-level device exploitation requires the manufacturer in the loop, and we say so rather than implying otherwise.
Yes — an evidence pack mapped to the questionnaire, tested controls, and a report written to the standard those audits expect.
Send the network diagram and the maintenance calendar. We will propose a test plan that fits both.
Start the conversation