Pekanbaru

Security Assessment from Pekanbaru, Built for Riau Operations

Pekanbaru is our base. That changes what we can promise: on-site scoping in Riau is a same-week appointment, not a flight-and-hotel negotiation. The estate here looks different from Jakarta — oil and gas service companies, plantation and agribusiness groups, pulp and paper, regional banks and BPR, and the distribution chains that keep all of it moving.

The technical problem is also different. Operational technology, satellite links to remote sites, shared contractor accounts and spreadsheets that quietly became systems of record are the norm. We test those environments without stopping production, and we write findings in language a site manager and an auditor can both use.

Where the risk actually sits in Riau

Oil and gas services and supporting contractors

Field data acquisition, SCADA-adjacent monitoring, contractor remote access, and the files that carry production numbers. Contractor accounts are usually the widest path into the operator environment.

Plantation, agribusiness and pulp and paper

Plant networks, weighbridge and inventory systems, payroll for large seasonal workforces, and the ERP layer linking estates to head office. The common finding is one flat network from mill floor to finance.

Regional banks and BPR/BPRS

Core banking interfaces, mobile banking for a branch-light customer base, and IT governance evidence required under the OJK framework for BPR. Smaller teams, same obligations, shorter deadlines.

Logistics, distribution and trading

Warehouse management, order portals, EDI-style integrations with principals, and third-party access to pricing. Margin and customer data leak through exactly these paths.

Obligations that apply here

UU PDP 27/2022

Employee and customer data at plantation scale is personal data. The 3×24-hour notification duty assumes you can identify what left and when — most estates cannot answer that today.

PP 33/2026

Documented processing records, impact assessment and control evidence. This is the framework an auditor will use to test whether your policy exists beyond the PDF.

POJK 34/2025 + PADK 43/2025

IT requirements and cyber resilience expectations for BPR/BPRS, including the deadline schedule that regional banks are working toward right now.

Perpres 82/2022 and BSSN Regulation 2/2024

For operators touching vital information infrastructure: incident handling and crisis management expectations, plus the reporting channel and its time limits.

Full instrument list and deadlines: Indonesia cyber regulation tracker.

How we work when the site is remote

1 — Remote scoping, on-site confirmation

First call maps the estate from head office. Then we come to the site to confirm what the diagram claims — usually the diagram is two versions old.

2 — Production-safe testing

OT and plant-floor testing is planned around shift changes and maintenance windows, with read-only methods wherever active testing would disturb a process.

3 — Evidence that survives distance

Screenshots, pcaps and timestamps collected on site, so findings do not depend on someone remembering what a screen looked like.

4 — Remediation with your team

A closing session with the people who will actually apply the fixes, not just the manager who signed the purchase order.

Practical questions for Riau teams

Can you reach sites outside Pekanbaru?

Yes. Dumai, Bengkalis, Pelalawan, Siak and other Riau locations are routine. Travel and accommodation are quoted transparently rather than hidden in the day rate.

Do you stop production to test?

No. Plant and OT testing is scoped to non-disruptive methods first: configuration review, passive capture and controlled checks inside an agreed window.

We are a small team with a regulator deadline. Where do we start?

Usually with a gap assessment against the specific instrument you are measured on. That tells you which evidence is missing before you spend budget on testing you cannot yet document.

Book a scoping session in Pekanbaru

On-site sessions in Pekanbaru and surrounding regencies can usually be scheduled within the same week.

Request a session